Free Landscaping Quote Template NZ

Price every load, plant and machine hour before you quote.

A free online landscaping quote template for Kiwi landscape construction crews. Price each stage line by line, with waste and margin on every item, set GST to 15% and it totals the lot. Print a branded PDF, export to CSV or send it into NextMinute. Nothing's stored online.

Free. Just pop in your details to get started.

NextMinute free job pricing calculator showing quote line items, GST and total
What It Does

From site measure to sent quote in three steps

Enter the job once and the totals look after themselves. Same list every time, so that extra load of base doesn't get forgotten.

1

Job and client details

Your logo and business name, the client, the site, quote date, valid-until date and payment terms.

2

Costs by stage

Start from the landscaping template and rename the stages to suit: site prep, paving, retaining, planting. Add a line for every crew hour, material, plant and machine.

3

Waste and margin on every line

Units, rate and charge type on each line, with its own waste % and margin %. Turf and pavers carry wastage. Plants can carry a different margin.

✓

Your result

Subtotal, GST and total, ready to print as a PDF with your logo, export to CSV or send to NextMinute.

Try the quote builder
Who It's For

Made for landscape construction crews

Paving, retaining walls, decks, fencing, turf, planting and full section makeovers. Built for Kiwi landscape construction businesses with a crew to keep busy.

Trade crew with utes on a job site
Why It's Useful

Nothing left off the quote

Deliveries, cartage, green waste and machine hire each get their own line. No more burying them in a round number.

Margin on every line

A bobcat day and a pallet of pavers don't need the same markup. Set waste % and margin % per item.

A quote that looks the part

A clean PDF with your logo and terms, sent the same day as the site visit.

How To Quote It

How to quote a landscaping job

Most landscaping jobs don't lose money on the rates. They lose it on what got left off. Work through the same buckets every time.

Labour + Materials and plants + Machine hire + Subcontractors + Margin and wastage + GST = Quote total

1

Measure up and price the labour. Square or lineal metres, access for machines and deliveries, then crew hours per task at your charge-out rate.

2

List materials, plants and machines. Turf, pavers, basecourse, aggregate, timber, drainage, soil and plants, plus digger, bobcat or compactor hire, deliveries and cartage.

3

Add waste, allowances and margin. A waste % on anything you cut, a line for site unknowns, then margin on the full cost.

Before you send it

Check these are in. They're the lines most often left off a landscaping job.

SpoilRemoval and green waste
DeliveriesCartage for every load
Machine floatTo and from site
AccessSide paths and barrowing
Why It Matters

Where landscaping quotes leak margin

These are the costs that bite on a backyard build.

More spoil than expected

Extra digging means extra dump runs, and gate fees include the waste levy.

Short on basecourse

One more load of base or aggregate, plus another delivery.

Cut waste

Turf, pavers and timber priced at net area, then you're short on the day.

Barrowing time

No machine access turns a one-day job into two.

Next Step

The quote is the start. NextMinute runs the job.

Once the client says yes, send the quote into NextMinute and it becomes a live job. Schedule the crew, capture timesheets and site photos against the job, and see actual vs quoted while you're still on site.

NextMinute app on a phone

Reviews

Real tradies. Real results.

Rated 4.9/5 with 100+ reviews on Google and Facebook, with local NZ support that actually helps.

Swipe to explore →
StarStarStarStarStar
Tarsha has been great to work with, the post purchase support is wicked.
Scott Cooper
Chernishoff Construction
Building company in Canterbury
Posted on Google Reviews on October 1, 2026
Google Icon
StarStarStarStarStar
We have been using NextMinute for just over a month now and love it! It is easy to use and the reporting is great for tracking real time costs! The set up was made super easy with Tarsha always available to answer questions and promptly responding to emails!
Anna Tuisila
Field and Hall Limited
Building company in Wellington
Posted on Google Reviews on July 30, 2026
Google Icon
StarStarStarStarStar
Could not fault the onboarding process from start to finish...and beyond! Tarsha was absolutely amazing at making sure every query was answered and went above and beyond. Highly recommend the software for any construction based company thinking about taking the leap. Nothing is overwhelming once the onboarding is complete. Thanks again guys! :)
Georgia Windsor
Executive Construction & Civil
Earthworks company in Hamilton NZ
Posted on Google Reviews on July 28, 2026
Google Icon
StarStarStarStarStar
great and friendly support in setup
Jeremy Damerell
Buildam Construction Ltd
Building company in Tauranga
Posted on Google Reviews on June 26, 2026
Google Icon
StarStarStarStarStar
NextMinute has been a game-changer in our construction business. It's made our back costing so much easier, no more spreadsheets or data entry. The customer support is outstanding.
Nicky Lankshear
3D Constructions Services
Building company in Manawatu
Posted on Google Reviews on June 19, 2026
Google Icon
StarStarStarStarStar
Tarsha was super friendly and helpful, absolute pleasure dealing with her.
Matt Garlick
Supreme Builders
Building company in Bay of Islands
Posted on Google Reviews on June 9, 2026
Google Icon
StarStarStarStarStar
Love using NextMinute, all our staff are on the App for timesheets and it works really well collating all their information through to invoicing. Duncan and the support team are awesome. Highly recommend
Kirsten Batt
Central Southland Excavating Ltd
Earthworks company in Southland
Posted on Google Reviews on May 29, 2026
Google Icon
StarStarStarStarStar
NextMinute has been great for my business to get up and running. Streamlined everything I was doing on paper onto a simple platform to help keep track of everything. Duncan is great at helping my navigate through the software.
Caleb King
King Construction
Building company in Timaru
Posted on Google Reviews on May 29, 2026
Google Icon

Landscaping quoting questions from NZ landscapers

We’ve answered the ones we hear most from Kiwi landscapers.

How do I quote a landscaping job in NZ?

Quote a landscaping job in NZ by measuring it on site, pricing crew hours per task, then listing materials, plants, digger or bobcat hire, deliveries and dump fees. Add wastage on anything you cut, a line for site unknowns, margin over the full cost and GST at 15%. Working from plans? Import takeoff quantities into NextMinute instead of keying them in.

How do I set GST to 15% on a landscaping quote?

The quote builder's GST rate is editable, so change it from the 10% default to 15% in the quote details before you add lines. The summary then shows subtotal, GST at 15% and total. In NextMinute's landscaping software, NZ GST is set up already, so quotes and invoices use 15% without any changes.

How do I price dump fees and the waste levy?

Price dump fees as their own line, by the load or by the tonne, using your local transfer station's gate fee. Gate fees in NZ include the national waste levy, and green waste, cleanfill and mixed waste are often priced differently. Add cartage for each run too. Track actual disposal costs against the quote with NextMinute back-costing.

How do I price rural or out-of-town landscaping jobs?

Rural and out-of-town landscaping jobs need travel, longer delivery runs and machine floats priced in. Add crew travel time and vehicle costs as their own lines, and check delivery charges with your supplier for the distance. For diesel utes, allow for Road User Charges on top of fuel. The fuel cost calculator works out the fuel side.

How much should landscapers charge per hour in NZ?

Your hourly rate needs to cover wages, KiwiSaver, holiday pay, ACC levies, insurance, vehicles, downtime and profit, not just what you pay the crew. Work it out from your own costs rather than copying someone else's. The free labour charge-out calculator builds it up, then use that rate in the quote builder.

How much wastage should I allow on turf and pavers?

Allow wastage on anything you cut, like turf, pavers, edging and timber. Curves, angles and small areas waste more than straight runs. The quote builder defaults to 10% waste per line and you can change it on each line, so turf and pavers can carry different figures. Compare actual material use to your quote in NextMinute to tune it over time.

Does NextMinute work with Xero?

Yes, NextMinute connects to Xero, so invoices raised against a landscaping job flow into your accounts without double entry. The free quote builder doesn't connect to Xero, but once you export a quote into NextMinute the job and its invoices sync. See the NextMinute Xero integration for details.

Can I add my logo to a landscaping quote?

Yes, upload your logo in the quote details and it prints on the PDF with your business name, client details, quote date, valid-until date and payment terms. Sending a tidy, branded quote the same day as the site visit helps you win the job. In NextMinute, every quote carries your branding automatically.

Does the quote builder save my landscaping quotes?

No, the free quote builder doesn't store anything online. Export your quote as a CSV before closing the page, then import it later to edit or reuse it. To keep every quote saved against the client and job, start a free NextMinute trial and export the quote straight in.

What happens when I export a landscaping quote to NextMinute?

Exporting a quote to NextMinute turns it into a live job with the same stages and line items. From there you can schedule the crew, capture timesheets and site photos, and compare actual costs to what you quoted while the job's still running, rather than finding out after it's done.