Free Roofing Quote Template NZ

Price the flashing, fixings and scaffold before you quote.

A free online roofing quote template for Kiwi roofing crews. Price each stage line by line, with waste and margin on every item, set GST to 15% and it totals the lot. Print a branded PDF, export to CSV or send it into NextMinute. Nothing's stored online.

Free. Just pop in your details to get started.

NextMinute free job pricing calculator showing quote line items, GST and total
What It Does

From roof measure to sent quote in three steps

Enter the job once and the totals look after themselves. Same structure every time, so the extra box of fixings is always in.

1

Job and client details

Your logo and business name, the client, the site, quote date, valid-until date and payment terms.

2

Costs by stage

Start from the roofing template and rename the stages to suit: strip-out, roof, flashings, spouting. Add a line for every sheet, fixing, crew hour and skip.

3

Waste and margin on every line

Units, rate and charge type on each line, with its own waste % and margin %. Sheets and flashing carry offcut waste. Scaffold hire doesn't.

✓

Your result

Subtotal, GST and total, ready to print as a PDF with your logo, export to CSV or send to NextMinute.

Try the quote builder
Who It's For

Made for roofing crews

New roofs, re-roofs, spouting and repairs. Built for Kiwi roofing businesses running a crew across several jobs at once.

Trade crew with utes on a job site
Why It's Useful

Nothing left off the quote

Flashing, fixings, underlay, access and disposal each get their own line. Nothing hides in the roofing iron price.

Margin on every line

Sheet metal and scaffold hire don't need the same markup. Set waste % and margin % per item.

A quote that looks the part

A clean PDF with your logo and terms, sent off the back of the ute.

How To Price It

How to price a roofing job

Roofing quotes go sideways on the details. Price every job in the same buckets, add access and allowances, then GST.

Labour + Materials + Access and safety + Disposal + Margin and wastage + GST = Quote total

1

Measure up and price the labour. Area, pitch, valleys, hips and penetrations all change your labour and waste. Cost strip-out, install, flashings and clean-up at your charge-out rate.

2

List the materials. Roofing iron or tiles, battens, underlay, flashing, fixings, spouting and downpipes, with a waste % on anything you cut.

3

Add access, safety and disposal. Scaffold or edge protection, height safety gear, skips and dump fees for the old roof, then margin on every line.

Before you send it

Check these are in. They're the lines most often left off a roof.

AccessScaffold or edge protection
Old roofRemoval and disposal
FlashingValleys and penetrations
WeatherAllowance for lost days
Why It Matters

Where roofing quotes leak margin

These are the ones that bite on a roof.

Flashing and fixings

Valleys, hips and penetrations always eat more than the plans suggest.

Access gear

Scaffold and edge protection hire running longer than planned.

Disposal

The old roof has to go somewhere, and the tip isn't free.

Rotten battens

You won't see them till the old roof's off. Put an allowance in.

Next Step

The quote is the start. NextMinute runs the job.

Once the quote's accepted, send it into NextMinute and it becomes a live job. Schedule the crew around the weather, keep photos and notes on the job, track time and costs as they happen, and invoice from the same place.

NextMinute app on a phone

Reviews

Real tradies. Real results.

Rated 4.9/5 with 100+ reviews on Google and Facebook, with local NZ support that actually helps.

Swipe to explore →
StarStarStarStarStar
Tarsha has been great to work with, the post purchase support is wicked.
Scott Cooper
Chernishoff Construction
Building company in Canterbury
Posted on Google Reviews on October 1, 2026
Google Icon
StarStarStarStarStar
We have been using NextMinute for just over a month now and love it! It is easy to use and the reporting is great for tracking real time costs! The set up was made super easy with Tarsha always available to answer questions and promptly responding to emails!
Anna Tuisila
Field and Hall Limited
Building company in Wellington
Posted on Google Reviews on July 30, 2026
Google Icon
StarStarStarStarStar
Could not fault the onboarding process from start to finish...and beyond! Tarsha was absolutely amazing at making sure every query was answered and went above and beyond. Highly recommend the software for any construction based company thinking about taking the leap. Nothing is overwhelming once the onboarding is complete. Thanks again guys! :)
Georgia Windsor
Executive Construction & Civil
Earthworks company in Hamilton NZ
Posted on Google Reviews on July 28, 2026
Google Icon
StarStarStarStarStar
great and friendly support in setup
Jeremy Damerell
Buildam Construction Ltd
Building company in Tauranga
Posted on Google Reviews on June 26, 2026
Google Icon
StarStarStarStarStar
NextMinute has been a game-changer in our construction business. It's made our back costing so much easier, no more spreadsheets or data entry. The customer support is outstanding.
Nicky Lankshear
3D Constructions Services
Building company in Manawatu
Posted on Google Reviews on June 19, 2026
Google Icon
StarStarStarStarStar
Tarsha was super friendly and helpful, absolute pleasure dealing with her.
Matt Garlick
Supreme Builders
Building company in Bay of Islands
Posted on Google Reviews on June 9, 2026
Google Icon
StarStarStarStarStar
Love using NextMinute, all our staff are on the App for timesheets and it works really well collating all their information through to invoicing. Duncan and the support team are awesome. Highly recommend
Kirsten Batt
Central Southland Excavating Ltd
Earthworks company in Southland
Posted on Google Reviews on May 29, 2026
Google Icon
StarStarStarStarStar
NextMinute has been great for my business to get up and running. Streamlined everything I was doing on paper onto a simple platform to help keep track of everything. Duncan is great at helping my navigate through the software.
Caleb King
King Construction
Building company in Timaru
Posted on Google Reviews on May 29, 2026
Google Icon

Roofing quoting questions from NZ roofers

We’ve answered the ones we hear most from Kiwi roofers.

What should a roofing quote include in NZ?

A roofing quote in NZ should include labour for strip-out, install and clean-up, roofing iron or tiles with wastage, flashing, fixings, underlay, spouting, scaffold or edge protection, dump fees for the old roof, margin and GST at 15%. Add an allowance for rotten battens and spell out exclusions. NextMinute's roofing software keeps that structure on every job.

How do I set GST to 15% on a roofing quote?

The quote builder's GST rate is editable, so change it from the 10% default to 15% in the quote details before you add your lines. The summary then shows subtotal, GST at 15% and total. In NextMinute, NZ GST is set up already, so quotes and invoices use 15% with no changes.

Does a re-roof need building consent in NZ?

Some NZ re-roofs need building consent and some don't. Replacing a roof with comparable materials is often exempt, but changing the roofing type, structure or weight can need consent. Check with your local council before you quote, and add consent fees and time as their own lines if they apply. Keep council documents against the job in NextMinute.

How do wind zones and coastal sites affect a roofing quote?

Wind zone and coastal exposure change what you need to price. Higher wind zones can need more fixings and different fixing patterns, and sites near the sea may need a more corrosion-resistant material grade and fixings. Check the site's wind zone and exposure before you quote, then price the right materials and extra fixing time as separate lines in the quote builder.

How do I price travel to rural roofing jobs?

Price travel to rural roofing jobs as its own line. Add crew travel time, vehicle costs, delivery charges for materials and scaffold, and accommodation if the crew stays away. For diesel utes, allow for Road User Charges on top of fuel. The fuel cost calculator works out the fuel cost before you add it to the quote.

How much wastage should I allow on roofing iron and flashing?

Allow wastage on anything you cut, like roofing iron, tiles and flashing. Hips, valleys and complex roof shapes create more offcuts than a simple gable. The quote builder defaults to 10% waste per line, and you can change it on each line. Compare actual material use against the quote with NextMinute back-costing to tune your figures.

Does NextMinute work with Xero?

Yes, NextMinute connects to Xero, so invoices raised against a roofing job flow into your accounts without double entry. The free quote builder doesn't connect to Xero itself, but once you export a quote into NextMinute the job and its invoices sync. See the NextMinute Xero integration.

Can I add my logo to a roofing quote?

Yes, upload your logo in the quote details and it prints on the PDF with your business name, client details, quote date, valid-until date and payment terms. A branded quote sent straight after the roof inspection stands out against a handwritten one. In NextMinute, every quote carries your branding automatically.

Does the quote builder save my roofing quotes?

No, the free quote builder doesn't store anything online. Export your quote as a CSV before closing the page, then import it later to edit or reuse it. To keep every quote saved against the client and job, start a free NextMinute trial and export the quote straight in.

What happens when I export a roofing quote to NextMinute?

Exporting a roofing quote to NextMinute turns it into a live job with the same stages and line items. You can then schedule the crew around the weather, keep photos and notes against the job, record timesheets and compare actual costs to the quote while the work is still underway.